维普中文期刊产品整合服务

Prediction of Debris-flow Danger Area by Combining Hydrological and Inundation Simulation Methods

查看全文 作  者:CUI [1,2]Peng HU [1,2]Kaiheng ZHUANG [1,3]Jianqi YANG [1,2]Yu ZHANG [1,3]Jianqiang 高影响力作者 机构地区:[1]Key Laboratory of Mountain Hazards and Earth Surface Process, Chinese Academy of Sciences, Chengdu 610041, China;[2]Institute of Mountain Hazards and Environment, Chinese Academy of Sciences, Chengdu 610041, China;[3]Graduate School of Chinese Academy of Sciences, Beijing 100049, China高影响力机构 出  处:《Journal of Mountain Science》索引2011年第8卷第1期,共9页高影响力期刊 基  金:supported by the National Basic Research Program of China(973 Program)(Grant No.2011CB409902);the National Natural Sciences Foundation of China(Grant No. 40671025) 摘  要:Debris flows have caused serious human casualties and economic losses in the regions strongly affected by the Ms8.0 Wenchuan earthquake of 2008. Debris flow mitigation and risk assessment is a key issue for reconstruction.The existing methods of inundation simulation are based on historical disasters and have no power of prediction.The rain-flood method can not yield detailed flow hydrograph and does not meet the need of inundation simulation. In this paper,the process of water flow was studied by using the Arc-SCS model combined with hydraulic method,and then the debris flow runoff process was calculated using the empirical formula combining the result from Arc-SCS.The peak discharge and runoff duration served as input of inundation simulation. Then,the dangerous area is predicted using kinematic wave method and Manning equation.Taking the debris flow in Huashiban gully in Beichuan County,Sichuan Province,China on 24 Sep.2008 as example,the peak discharge of water flow and debris flow were calculated as 35.52 m3·s-1 and 215.66 m3·s-,with error of 4.15%compared to the measured values.The simulated area of debris-flow deposition was 161,500 m2,vs.the measured area of 144,097 m2,in error of 81.75%.The simulated maximum depth was 12.3 m,consistent with the real maximum depth between 10 and 15 m according to the field survey.The minor error is mainly due to the flow impact on buildings and variations in cross-section configuration.The present methodology can be applied to predict debris flow magnitude and evaluate its risk in other watersheds inthe earthquake area. 关 键 词:泥石流灾害 危险区预测 模拟方法 水灾 流量过程线 SCS模型 水文 风险评估
相关文献

参考文献(21)

引证文献(34)

耦合文献(90)

网站首页 | 关于我们 | 联系我们 | 产品服务 | 客服中心 | 广告服务 | 版权声明 | 网站联盟 | 友情链接 | 售卡网点

版权所有© 渝B2-20050021-1 渝公网安备 50019002500403号 违法和不良信息举报中心

互联网出版许可证 新出网证(渝)字10号 全国400电话 - 免长途话费