维普中文期刊产品整合服务

Multi-reservoir joint operating rule in inter-basin water transfer-supply project

查看全文 作  者:PENG [1]AnBang;PENG [1]Yong;ZHOU [1]HuiCheng;ZHANG [1]Chi 高影响力作者 机构地区:[1]School of Hydraulic Engineering, Dalian University of Technology高影响力机构 出  处:《Science China(Technological Sciences)》索引2015年第58卷第1期,共15页高影响力期刊 基  金:supported by the Major International(Regional)Cooperation Project(Grant No.51320105010);the National Natural Science Foundation of China(Grant Nos.51379027,51109025);the Fundamental Research Fund for the Central Universities(Grant No.DUT13JS06) 摘  要:The joint operation of inter-basin water transfer-supply(IBWTS)project can be more complex when there is joint water demand in multi-reservoir system and multi-importing reservoirs simultaneously transferring water from exporting reservoir.In this study,a joint operating rule is proposed for the purpose of solving such complex operation problem.This rule is composed of a set of sub-rules,including hedging rule curves of virtual aggregation reservoir(i.e.equivalent reservoir)and other individual reservoirs,water-transfer rule curves of each individual reservoir,as well as some of important assisted rules.These assisted rules refer to allocation models for water transfer-supply.In the proposed rule,an equivalent reservoir is established to determine under what condition the water supply should be reduced and specify the total supplied water for joint water demand(i.e.aggregation method).Allocation models are developed to distribute the total transferred water into each importing reservoir and determine the water releases for joint water demand by each member reservoir of the aggregation system(i.e.decomposition method).And these models are integrated with a set of influence factors such as hydrologic characteristics,reservoir storage or vacant storage,regulating ability,water-supply pressure,and so on.The aggregation of multi-reservoirs and the disaggregation of water quantities are taken into a whole consideration to reduce the complexity in reallocation of water target storage or water release.Finally,the proposed rule is applied to the North-line IBWTS Project in Liaoning Province,China.The results indicate that the proposed rule can take full advantage of hydrologic compensation in basins and capacity compensation in reservoirs.Thus it can improve the utilization efficiency of water resources in system. 关 键 词:多水库系统 跨流域调水 供水工程 运行规则 水文补偿 水资源系统 联合行动 操作规则
相关文献

参考文献(29)

引证文献(10)

耦合文献(41)

网站首页 | 关于我们 | 联系我们 | 产品服务 | 客服中心 | 广告服务 | 版权声明 | 网站联盟 | 友情链接 | 售卡网点

版权所有© 渝B2-20050021-1 渝公网安备 50019002500403号 违法和不良信息举报中心

互联网出版许可证 新出网证(渝)字10号 全国400电话 - 免长途话费