维普中文期刊产品整合服务

Understanding the need for pre-injection from permeability measurements: What is the connection?

查看全文 作  者:Nick [1]Barton;Eda [2]Quadros 高影响力作者 机构地区:[1]Nick Barton & Associates,Oslo,Norway;[2]BGTech Soil and Rock Engineering Ltd.,Sao Paulo,Brazil高影响力机构 出  处:《Journal of Rock Mechanics and Geotechnical Engineering》索引2019年第11卷第3期,共22页高影响力期刊 摘  要:Pre-grouting ahead of tunnels has three main functions:to control water inflow into the tunnel,to limit groundwater drawdown above the tunnel,and to make tunnelling progress more predictable since rock mass quality is effectively improved.It helps to avoid settlement damage caused by consolidation of clay deposits beneath built-up areas,since towns tend to be built where terrain is more flat,due to the clay deposits.There are so many instances of settlement damage that the profession needs to take note of the need for high-pressure pre-grouting,to use micro-cements and micro-silica additives.The use of highpressure injection may cause joint jacking,but this is local in extent when the rapid pressure decay away from an injection hole is understood.This effect is variable and depends on the geometrical parameters of the joints.This pressure-decay advantage must not be violated by maintaining high pressure when grout flow from the injection hole has ceased.The latter can cause damage to the grouting already achieved.Simplified methods of estimating mean hydraulic apertures(e)from Lugeon testing are described,and from more sophisticated three-dimensional(3D)permeability measurement.The estimation of the larger mean physical joint apertures(E)is based on the joint roughness coefficient(JRC).Comparison is then made with the empirical aperture-particle size criterion E>4d95,where d95 represents almost the largest cement particle size.Depending on joint set orientations and on the available micro-cements,the decision must be made of which range of pre-injection pressure should be aimed for,using successive reductions of the water-cement ratio w/c.More simple estimation of permeability,also with depth dependence,can be made with the empirical link between a modified rock mass quality Q and permeability,which is termed QH2O.The value of this parameter can be based on core-logging or intunnel face logging.The 3D before-and-after-grouting permeability measurements have been used to justify the quantification of rock mass quality Q-parameter improvement,and the consequent increases in expected P-wave velocity and deformation modulus,for application in dam foundation treatment and its monitoring. 关 键 词:PRE-GROUTING Micro-cement Hydraulic apertures Physical joint apertures Joint roughness Particle size Anisotropic permeability
相关文献

参考文献(56)

引证文献(10)

网站首页 | 关于我们 | 联系我们 | 产品服务 | 客服中心 | 广告服务 | 版权声明 | 网站联盟 | 友情链接 | 售卡网点

版权所有© 渝B2-20050021-1 渝公网安备 50019002500403号 违法和不良信息举报中心

互联网出版许可证 新出网证(渝)字10号 全国400电话 - 免长途话费