维普中文期刊产品整合服务

Characteristics of sedimentation and channel adjustment linked to the Three Gorges Reservoir

查看全文 作  者:Xiaoya [1,2]Tang;Sichen [1]Tong;Guoxian [2,3]Huang;Guangxiang [1]Xu;Xinghua [2]Li;Kun [2]Lei;Shiming [4]Yao 高影响力作者 机构地区:[1]School of River and Ocean Engineering,Chongqing Jiaotong University,Chongqing 400074,China;[2]Chinese Research Academy of Environmental Sciences,Beijing 100012,China;[3]State Key Laboratory of Plateau Ecology and Agriculture,Qinghai University,Xining 810016,China;[4]Key Laboratory of River Regulation and Control of Ministry of Water Resources,Changjiang River Scientific Research Institute,Wuhan 430010,China高影响力机构 出  处:《International Journal of Sediment Research》索引2021年第36卷第2期,共13页高影响力期刊 基  金:The research reported herein was funded by the National Natural Science Foundation of China(Grant No.52079130);National Key Research and Development Program of China(Grant No.2017YFC0506601);Basic and Frontier Research Programs of Chongqing(Grant No.Cstc2018jcyjAX0534);Postgraduate Research and Innovation Programs of Chongqing(Grant No.CYB18169);Modeling and Application of Water Environment in the Yangtze River Basin(Grant No.2019-LHYJ-0102). 摘  要:Construction of large dams is attractive because of their great benefits in flood control,hydropower generation,water resources utilization,navigation improvement,etc.However,dam construction may bring some negative impacts on sediment transport and channel dynamics adjustments.Due to the effects of recent water and soil conservation projects,sediment retention in the newly constructed large upstream reservoirs,and other factors,the sedimentation in the Three Gorges Reservoir(TGR)is quite different from the amount previously predicted in the demonstration stage.Consequently,based on the measured data,characteristics of sedimentation and the related channel deformation in the TGR were analyzed.The results imply that sediment transport tended to be reduced after the Three Gorges Project(TGP).Sedimentation slowed dramatically after 2013 and indicated obvious seasonal characteristics.Due to the rising water level in the TGR in the flood season,the yearly sediment export ratio(Eratio)was prone to decrease.The water level near the dam site should be reasonably regulated according to the flow discharge to improve the sediment delivery capacity and reduce sedimentation in the TGR,and to try to avoid situations where the flood retention time is close to 444 h.The depositional belt was discontinuous in the TGR and was mainly distributed in the broad reaches,and only slight erosion or deposition occurred in the gorge reaches.Sedimentation in the broad and gorge reaches accounted for 93.8% and 6.2% of the total sedimentation,respectively.The estuarine reach located in the fluctuating backwater area experienced alternate erosion-deposition,with a slight accumulative deposition in the curved reach.Sedimentation mainly occurred in the perennial backwater area.The insight gained in this study can be conducive to directly understanding of large reservoir sedimentation and mechanism of channel adjustment in the reservoir region in the main channel of large river. 关 键 词:Three Gorges Reservoir Sedimentation characteristics Channel adjustment Reduced sediment load
相关文献

参考文献(39)

引证文献(8)

耦合文献(99)

网站首页 | 关于我们 | 联系我们 | 产品服务 | 客服中心 | 广告服务 | 版权声明 | 网站联盟 | 友情链接 | 售卡网点

版权所有© 渝B2-20050021-1 渝公网安备 50019002500403号 违法和不良信息举报中心

互联网出版许可证 新出网证(渝)字10号 全国400电话 - 免长途话费